Saudi Constructioneers Ltd  - RECORDS OF PROJECT EXECUTED

PROJECT / LOCATION ARCHITECT / CONSULTANT OWNER COMPLETION VALUE (SR/US$)
KAFD Conference Center Contract 2, Parcel A.01 (C28C) / Riyadh K.S.A Skidmore, Owings & Merrill LLP (SOM) Rayadah Investment Company – RIC
April 2014 SR 755,000,000  
$ 201,333,333

 
The KAFD Conference Center is located at King Abdullah Financial District (KAFD) in the North King Fahd Road Corridor. The Conference Centre is an attractor building located adjacent the Financial Plaza with total approximate area of 121,757,07m. The contract 2 works are consisting of fit out and MEP Works with the exception of the structural concrete. The works are to include the external landscaping and will incorporate the specialist sub contract for the mega roof structure and external enclosure as well as the state of art audiovisual technologies at auditorium, conference and banquet halls.

PROJECT / LOCATION

ARCHITECT / CONSULTANT

OWNER COMPLETION

VALUE (SR/US$)

KING ABDULLAH FINANCIAL DISTRICT - Package “DB06D” Parcel 5.07 & 5.08
Riyadh K.S.A.
Omrania & Associates Rayadah Investment Company – RIC
April 2014 SR 1,150,000,000
$ 307,000,000

 
Located in King Abdullah Financial District, Riyadh, K.S.A. with Plot Nos. 5.07 and 5.08, which is designed to be one of the regions best-planned communities, providing sophisticated metropolitan design with a futuristic skyline, offers luxurious residential and office spaces with high quality finishes. The project consists of four (4) towers interconnecting with each other on two plots. The towers will be built above ground floor level for commercial, residential and offices. Each plot has two towers one for offices and one for residential consisting of furnished apartments. The Total Built-Up Area shall be 156,000m². A Basement of four levels will be provided for parking and technical use. Consist of retail shops at Wadi level located at the first basement.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 156.000 m2.

AL QASR MALL PACKAGE 6A & 6B
Riyadh K.S.A.
Saudi Diyar Consultant Dar Al Arkan Real-Estate Company
13/10/1431 H.
22/09/2010 G.
SR 234,750,000 Pck. 6A
$ 62,267,904.51
SR 372,500,000 Pck. 6B
$ 99,333,333.33

 
AL QASR MALL is one of the prestigious project in South Riyadh with 244,809.00 m2 covered area, plot area 58,216 m² is located at Al Qasr district area development by DAR AL ARKAN. AL QASR MALL, RIYADH, a three storey commercial and shopping center with ground floor level and basement level as parking area. The AL QASR MALL includes a Hypermarket, Lines of Shops, Fun Rides, Boating Area, Amusement Area and Food Court complete with all related support services. Package 6A (Structural works), comprises of excavation works, cast in situ beams and columns, pre-stressed pre-cast slab and space frame roofing. Package 6B comprises of Architectural & MEP Works.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 244,809 m2.

JABAL AL KABAH PACKAGE TP1 PROJECT
Makkah K.S.A.
Dar Al Handasah Shair & Partners Abdul Latif Jameel Real Estate Investment Co
21/03/1431 H.
18/03/2009 G.
SR 86,347,664
$ 23,026,043

 
Jabal Al Kabah Project Package TP1: A lump-sum contract, comprise of Jabal Al-Kabah Housing - Hotel located in Makkah Al Mukarramah, K.S.A. only structural, masonry and finishing works. The project is construction of a high-rise, 110 meters, 1780 Guestrooms, 118,087m² Four Stars Hotel proposed to be built as Phase 1 of the Jabal Al Kabah Project on a defined Phase 1 site limit of 6850m². The project consist total 36 floors which of 3 basements occupying the whole site, podium levels composed of ground, mezzanine, and first floor and the tower that includes technical floor below and on top and 26 Typical Floors. The Building is U Shaped, enclosing a landscaped piazza. The piazza is connected to the outside in the direction of the Haram through an underground pedestrian passage.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of118,087m2.

KINGDOM HOSPITAL 3rd& 4th FLOOR FIT-OUT
Riyadh K.S.A.
Omrania & Associates Kingdom Hospital
09/01/1431 H.
26/12/2009 G.
SR 29,000,000
$ 7,733,333.33

 
Kingdom Hospital is one of the famous Hospitals in Saudi Arabia. 3rd & 4th Floors are under construction with 4,000m² covered area, with high standard finishing level (VIP Level).3rd & 4th Floor comprises of 14 VIP suites, 28 VIP Patient rooms, ICU Sections & Medical services/ supporting areas including all Hospital system such as Fire alarm, Fire fighting, HVAC, Nurse Call, PABX, CCTV, BMS. Public Address System & Medical gas system.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 4,000 m2.

KING ABDULLAH BIN ABDULAZIZ GENERAL ASSEMBLY HQ
Riyadh K.S.A.
Takweenat Consulting Engineering - Riyadh King Abdullah Bin Abdulaziz General Assembly
1428 H.
2007 G.
SR 19, 446,284
$ 5,801,150

 
A lump-sum Contract Project, comprising of Finishing, Electro-mechanical and Site External works for a 3-storey Building to be utilized as the Head Office of the KABA Est. The main Building of triangular shape in plan, consists of Royal suites, VIP Section.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of m2.

AL SHUBAILY GRAND MALL (PACKAGE-I)
Al-Khobar K.S.A.
Omrania & Associates Khalid S.Al-Shubaily Group real-Estate Investment
1426 H.
2005 G.
SR 219,890,484.39
$ 58,637,462.50

 
SHUBAILY GRAND MALL is one of the prestigious project in Al-Khobar with 248,378.28 m2 covered area is located on a 274,118 m2 site adjacent to the Arabian Gulf, on the northern side of the highway approach to the Saudi Arabian – Bahrain Causeway. The center comprises a main hall, essentially triangular on plan with curvilinear faced and two rectangular structures adjoining the north and south ends of the Main Mall. The Main Mall comprises three levels; Ground Floor level accommodating parking retail outlets, themed restaurants and service/support areas; First Floor level accommodating retail units and themed restaurants; Second Floor level accommodating retail units, family entertainment centre, food court and themed restaurants. Where the rectangular structure at the north comprises of Parking Ground floor, Anchor store at First Floor and Second Floor, the rectangular structure at the south comprises parking at the Ground Floor, Hypermarket at First Floor and three numbers multi purpose Celebration Halls at second floor. Package – I Structural Works: Comprises of Piling works, cast in situ, beams and columns, pres-stressed pre- cast Slabs, steel structures and space frame roofing.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 274,118 m2.

GRANADA CENTER
Riyadh K.S.A.
MR. NABIL I. FANOUS, MR. ALI M. AL DAKMARY / Zuhair Fayez Partnership Consultants General Organization for Social Insurance (GOSI)
24/06/1426 H.
31/07/2005 G.
SR 308,544,169
$ 82,278,445

 
Granada Center is a Landmark Project as one of the biggest shopping center in Riyadh with 150,000 m2 covered area. The shopping center includes a hypermarket which is operated by Carrefour. The project constructed by using the latest technology as thermal energy storage system, pre-stressed concrete pre-cast slabs, external pre-cast concrete panels, space frames, seamless standing roofing system, skylights, diochroic art glass panels, custom made aluminum ceilings. The shopping center includes food court and catering areas, playground areas, tenant’s shops and anchor retails shops distributed on the ground and the first floors. It is a turnkey project including land development, external landscaping works, parking lot, roads, interior design work, electro-mechanical works and equipments except the tenant’s areas which were furnished by each tenant.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 150,000 m2.

CITY PLAZA HOME PLAZA – RIYADH
Riyadh K.S.A.
AL-MUTLAQ GROUP AL-MUTLAQ GROUP
17/08/1426 H.
21/09/2005 G.
SR 18,500,000
$ -

 
City Plaza Home Plaza is a prestigious showroom at Imam Saudi Bin Mohammed Road, Granada District. The Project consists of 2-Storey building. Covered area 12,200 m2 equal distributed in Ground Floor and First Floor Planned to be used as display area for the City Plaza – Home Plaza showrooms. The building is constructed by using precast double-T slabs, external cladding; cast-in-situ foundation, column and beams. The building has walkator, central HVAC System fire alarm and firefighting system with external aluminum curtain wall. It is a lump sum contract. The scope of works includes land development, external landscaping and hardscaping works and interior finishing.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 12,700 m2.

HARADH GAS PLANT INDUSTRIAL SUPPORT FACILITIES (ISF)
HARADH K.S.A.
Saudi Constructioneers Ltd / Saudi Arabian Oil Company (ARAMCO) Saudi Arabian Oil Company (ARAMCO)
03/07/1424 H.
31/08/2003 G.
SR 121,824,227
$ -

 
A lump sum Turnkey (LSTK) Project which includes the Design Engineering, Material Procurement, Installation/Construction and Maintenance. The Project includes the construction of numerous buildings: Administration Building, Material Unit Building, Fire Station Building, Transportation Building, Power Distribution Building, Maintenance Complex and Various Shelters with infrastructure at the Industrial Support Facilities Area (ISF) of Haradh Gas Plant complete with the Site Preparation, Roads, Hardscaping, Site Utilities, Structural, Architectural, Electrical and Mechanical Works.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 116,222 m2 plus Shaded Area of 393m².

TAIBA RESIDENTIAL & COMMERCIAL CENTER 
Madinah, K.S.A.

Dar Al Riyadh Consultants TAIBA Investment & Real Estate Development Company 09/10/20 H.
16/01/2000 G.
SR 208,384,000
$ 55,569,000

 
Construction of 21 Stories Building, consisting of five nos. Basement Floors, Ground Floor, Mezzanine Floor and 14 upper Floors.   Apartments in the upper floors, shopping areas in Ground Floor, Mezzanine and First Basement Parking areas in the lower basements.  Including piling & shoring work for the Basements.  It is located adjacent to the Holy Mosque and equips with latest Electromechanical and Conveying Systems.  

Turnkey Contract for Construction, Testing, Commissioning & Maintenance.   

Total Build Area 61,352 m2

CONSULTING CLINICS BEIRUT Riyadh K.S.A.
Beirut, Lebanon.
Ziad Khalife /Client Representative Dr. M.Gandour + Dr. F.Takieddine
10/06/1421 H.
09/10/2000 G.
SR 30,375,000
$ 8,100,000

 
One of the most luxurious and largest Wedding Celebration Hall in K.S.A. Construction of Three Stories Building with Basement, consisting of Reception & Festival Halls, Restaurant and Parking. Combining cast-in-place concrete substructure and precast superstructure by other Contractor coordinated by us, high quality external Landscaping surrounded by featured Boundary Wall. Whole building equip with the latest technology and audiovisual and Electro-Mechanical Systems, and Conveying System.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of m2.

ABDULLAH AL-NIMR VILLAS PROJECT
Riyadh K.S.A.
Zuhair Fayez Partnership Mr. Abdullah Al-Nimr
12/02/1421 H.
16/05/2000 G.
SR 25,250,000
$ 6,733,333

 
Construction of Prestigious 5 nos. Villas, 2 nos. Dewaniyah, Servant Quarters, Guard Rooms, Shaded Walkways, U/G tanks, 7 nos. internal shaded sitting Area and Landscaping. The basement of the main Villa includes Swimming Pool, Jacuzzi, Gymnasium, and main kitchen including hood and complete kitchen equipment, internal and external flooring covered by granite material and all ceiling by decorative gypsum fibrous.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 15,364 m2.

HRH PRINCE AL-WALEED BIN TALAL MOSQUE
Riyadh K.S.A.
O & A (Omrania & Associates) HRH Prince Al-Waleed Bin Talal
30/09/1421 H.
26/12/2000 G.
SR 7,700,000
$ 2,053,333

 
A lump sum key project which includes the material procurement/installation/construction and maintenance. The project is a construction of mosque building including Earthworks, Structure, Architectural and Electromechanical Works which includes Imam and Mu’athen residence and 30 meters high Minaret.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 2,334 m2.

NAYARA CELEBRATION HALL
Riyadh K.S.A.
Salah
Abaalkhail Consulting Engineers
Nayara Company Limited
27/02/21 H.
31/05/2000 G.
SR 69,700,000
$ 18,587,000

 
One of the most luxurious and largest Wedding Celebration Hall in K.S.A. Construction of Three Stories Building with Basement, consisting of Reception & Festival Halls, Restaurant and Parking. Combining cast-in-place concrete substructure and precast superstructure by other Contractor coordinated by us, high quality external Landscaping surrounded by featured Boundary Wall. Whole building equip with the latest technology and audiovisual and Electro-Mechanical Systems, and Conveying System.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 15,364 m2.

Al-NAWRAS ISLAND RESORT
Jeddah K.S.A.
Archiplan SAUDI OGER LTD
02/07/1420 H.
11/10/1999 G.
SR 22,500,000
$ 6,000,000

 
Construction of 47 Buildings consisting of Junior Bungalows, Drivers Quarter, Two Bedroom Units, One Bedroom Units, Dormitories & public Toilet located on the Cornish of Jeddah along the Red sea. The scope of work includes excavation, backfilling, cast-in-situ concrete and damp proofing works. Each building rest on isolated foundation, wall footing, columns, grade beams and on slope of slabs.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 15,059.11 m2.

CREIC-NCCI HEAD OFFICE BUILDING Riyadh, K.S.A.

Omrania & Associates (O&A)

Cooperative Real Estate Investment Co. (CREIC)

06/09/19 H.  
24/12/98 G.

SR 239,000,000  
$ 63,733,000

 
Construction of 25 Stories Building, consisting of four nos. Basement Floors, Ground Floor, Mezzanine Floor & 19 upper floors.  Offices in the upper floors, Shops in Ground, First Floor, Mezzanine & Parking areas in the Basement Floors.  It is the first building in Saudi Arabia which is equip with Thermal Energy System (TES) beside the Structural Glass external cladding and latest Electromechanical and Conveying Systems.  

Turnkey Contract for Construction, Testing, Commissioning & Maintenance.   

Total Build Area 71,071 m2

REHABILITATION AND RECONSTRUCTION OF UNESCO PALACE SECOND STAGE
Beirut, Lebanon.
Lebanese Arab Contracting & Engineering Council for Development and Reconstruction
14/10/1417 H.
22/2/1997 G.
SR 12,000,000
$ 3,200,000

 
All Civil Interior Design work, all Electrical works comprising HVAC, Sound and Scenic/External Works, Paving, Lighting, Asphalt and Balustrades, etc.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of 13,000 m2.

GOSI INVESTMENT HOUSING PROJECT  
Jubail, K.S.A.

Al-Zaid Engineering Consultants

General Organization for Social Insurance (GOSI)

28/08/17 H.  
07/01/97 G.

SR 431,500,000  
$ 115,067,000

 
Construction of 387 nos. of two Stories Villas & Garages, 10 nos. Apartment Buildings with each 12 nos. Apartment Units, two nos. of Apartment Buildings with each 17 nos. Apartment Units & 35 nos. of Guardhouses.  

Lumpsum Turnkey Contract for Construction, Commissioning, Testing & Maintenance.   

Total Build Area 182,000 m2

REHABILITATION OF THE LEBANESE UNIVERSITY.
Beirut, Lebanon.
Lebanese Arab Contracting and Engineering Council for Development and Reconstruction
1416 H.
1995 G.
SR 56,250,000
$ 15,000,000

 
All Civil and Interior Design Works, all Electro/Mechanical Works comprising HVAC, Paving, Lighting and Asphalts.

Turnkey Contract for Construction, Commissioning and Maintenance.

Total Build Area of m2.

HRH PRINCE ABDULAZIZ BIN ABDULLAH BIN ABDULAZIZ PALACE  
Riyadh, K.S.A.

Zuhair Fayez Associates Architect & Engineering

HRH Prince Abdulaziz Bin Abdullah Bin Abdulaziz Palace

1414 H.  
1994 G.

SR 41,500,000  
$ 11,067,000

 
Construction of the Main Palace Building & Ancillary Buildings for Services, including Servant Houses, Guardhouses, Kitchen Building, Gazebo.  Development of external Garden about 13,000 m2.  Main Palace 6,377 m2 , Ancillary Buildings 1,521 m2,  Garden & External Works 13,820 m2 .  

Lumpsum Turnkey Contract for Construction & Maintenance.

PSYCHIATRIC HOSPITAL HOUSING Riyadh, K.S.A.

Al-Hejailan D.M.J. International

Ministry of Health

1412 H.  
1992 G.

SR 82,332,000  
$ 21,955,000

 
Construction and Maintenance of Housing Group comprising of: 20 Patient Villas of three Bedrooms, 108 Apartments of two Bedrooms, 232 Apartments of one Bedroom, 90 nos. one Bed Studios, 34 Apartments of four Bedrooms including Psychiatric Hospital and Ancillary Buildings Structural Works & Masonry Works. (Subcontract from: Hyundai Engineering & Construction Co., Ltd.)  

Lumpsum Turnkey Contract for Construction & Maintenance.

PSYCHIATRIC HOSPITAL & ANCILLARY BUILDINGS Riyadh, K.S.A.

Al-Hejailan D.M.J. International

Ministry of Health

1412 H.  
1992 G.

SR 28,000,000  
$ 7,467,000

 
Sub-structure, Super-structure Slab on grade & Block work.  

AL-RAWDAH SHARACO AMUSEMENT PARK  
Riyadh, K.S.A.

Sir William Halcrow & Lingawi Partners

Saudi Hotels & Resort Area Company

1408 H.  
1988 G.

SR 57,000,000  
$ 15,200,000

 
The project consist of two sections, Men Section & Ladies Section, including all roads, infrastructure services, Restaurant and Cafeteria Building, Administration Building, Landscaping, Car Park, Pedestrian Area and 22 Rides & Playground Areas.  

Lumpsum Turnkey Contract for Construction & Maintenance.

KING FAHD SECURITY COLLEGE PROJECT Riyadh, K.S.A.

Mohd. Al-Sabec

Ministry of Interior

1407 H.  
1987 G.

SR 179,512,000  
$ 47,870,000

 
Construction as Subcontractor of Hyundai Engineering of 310 Housing Units of two-three-four Bedroom Villas, two Schools, two Recreation Buildings, two Supermarkets, one Mosque, 310 Carports, concrete and infrastructure by Hyundai.   

Block works to Turnkey finish including Electrical & Mechanical Works.  

Lumpsum Turnkey Contract for Construction and Maintenance.

EXTENSION * GOSI NATIONAL HOSPITAL Riyadh, K.S.A.

Zuhair Fayez Associates Architect & Engineering

General Organization for Social Insurance (GOSI)

1405 H.  
1985 G.

SR 47,000,000  
$ 13,202,000

 
Construction of a fully equipped 45Beds Hospital, complete with Out Patient Clinics, Operation Rooms, X-ray, Physiotherapy, Medical Beds, Pharmacy, Central Laundry, Central Gas & Vacuum Installation, including Female Nurses and Families Apartment, composed of one Basement, Ground Floor and six upper Stories.  

Lumpsum Turnkey Contract for Construction and Maintenance.

CHAMBER OF COMMERCE HEADQUARTERS  
Riyadh, K.S.A.

Architectural & Planning (Omrania)

Chamber of Commerce & Industries

1403 H.  
1983 G.

SR 96,000,000  
$ 27,826,000

Composed of two Basements Parking Level, a Ground Floor, and six Floors with an Exterior of Glass and Marble.  

Lumpsum Turnkey Contract for Construction and Maintenance.

SABIC HEADQUARTERS Riyadh, K.S.A.

Saudi Consulting House * Lea A Daly

Saudi Basic Industries Corp. (SABIC)

1403 H.  
1983 G.

SR 137,000,000  
$ 39,710,000

 
Six Stories Main Building with a two Stories Subsidiary Building and two Levels of Parking Facilities.  

Lumpsum Turnkey Contract for Construction and Maintenance.

HANDICAPPED CHILDREN HOUSE, PROJECT No. 1 Riyadh, K.S.A.

Saudi Consulting Service

Handicapped Children Association

1405 H.  
1985 G.

SR 80,000,000  
$ 22,472,000

 
Construction of a 120 Beds Handicapped Children House, complete with all Special Handicapped Medical Installation, Rehabilitation Facilities and Out Patient Clinics. Composed of an Administration Building, Educational Center, Recovery & Treatment Center, six Housing Units for Handicapped Children, 17 two Stories Villas for married Supervisory Staff, 22 one Story Villas for Bachelor Staff, Service Buildings, Water Towers, Sewage Treatment Plant, Medical Swimming Pools, Sports & Training Facilities.  

Lumpsum Turnkey Contract for Construction and Maintenance.

KANOO BUILDING, Riyadh, K.S.A.

Architecture & Planning Consultants (Omrania)

Kanoo

1405 H.  
1985 G.

SR 20,000,000  
$ 5,618,000

 
Kanoo Headquarter Building composed of one Basement, one Ground Floor and three Floors upward with an Exterior Facade.  

Lumpsum Turnkey Contract for Construction and Maintenance.

NASSERIAH HOTEL  
Riyadh, K.S.A.

Rasim Sha*ath Saudi Consultant

H. H. Prince Mohd. Bin Saud Bin Abdulaziz

1403 H.  
1983 G. 

SR 15,267,000  
$ 4,425,000

 
Completion and Maintenance of a five Stories 200 Bed Hotel, including Restaurant, Cafeteria, Lobby, Shops including Electrical / Mechanical Works, HVAC Works, Elevators, TV System, Telephone and External Works.  

Total Build area 13,000 m2 . (Structural, Block, Roofing and Mechanical Works by Others.)  

Total Project Value SR 45,000,000 US$ 13,043,000.

RIYADH POSTAL CENTER Riyadh, K.S.A.

Sofrepost, Paris

Ministry of PTT General Directorate of Posts.

1402 H.  
1982 G.

SR 435,000,000  
$ 126,087,000

 
Main Post Office, Offices, a Mosque, a Restaurant, a Circular Roof Terrace, and three Subterranean Levels for Parking and the Electro*Mechanical Plant and Postal. Eight Floors upward for Offices.  

Lumpsum Turnkey Contract for Redesign, Construction, Maintenance and Staff Training.  

Build area 120,000 m2.

H.E. Dr. MEDHAT SHEIKH EL-ARD COMMERCIAL CENTER, Dammam, K.S.A.

Saudi Constructioneers Est.

H.E. Dr. Medhat Sheikh El-Ard

1401 H.  
1981 G.

SR 18,000,000  
$ 5,217,000

 
Commercial Building consisting of eight Stories, Ground Floor, Shopping, Underground Parking, Air-conditioning and all Electrical works.  

Lumpsum Turnkey Contract for Construction and Maintenance.

GENERAL ORGANIZATION FOR SOCIAL INSURANCE APARTMENT COMPLEX  
Riyadh, K.S.A.

Nabil Fanous & Bassem Shehabi

General Organization for Social Insurance (GOSI)

1400 H.  
1980 G.

SR 119,000,000  
$ 34,493,000

 
Three Buildings, two - nine Stories and one - seven Stories High. All 130 Apartments provided with Central Climate Control, large Verandas, full Equipped Kitchen, Underground Parking, Recreation Grounds, Pedestrian Bridges and Shopping Mall.  

Lumpsum Turnkey Contracts for Construction and Maintenance.

IRAQ LABOUR CAMP FOR BAGHDAD INTERNATIONAL AIRPORT PROJ. Baghdad, Iraq

Fougerolle / Spie-Batignoles S.a.

Fougerolle / Spie-Batignoles S.a.

1400 H.  
1980 G.

SR 5,000,000  
$ 1,449,000

 
Total Surface 4,508 m2, 68 Units Dormitories, 34 Units Sanitary Blocks and 3 Clubs.  

Lumpsum Turnkey Contract for Construction and Maintenance.

Saudi Constructioneers Est. COMPOUND Riyadh, K.S.A.

Saudi Constructioneers Est.

Saudi Constructioneers Est.

1399 H.  
1979 G.

SR 7,000,000  
$ 2,029,000

 
12 Villas fully Air-conditioned & Asphalt Roads.  

Lumpsum Turnkey Contract for Construction and Maintenance.

RAFIYAH COMPLEX  Riyadh, K.S.A.

Saudi Constructioneers Est.

Saudi Constructioneers Est.

1399 H.  
1979 G.

SR 15,000,000  
$ 4,348,000

 
Labor and Staff Housing, Warehouses, Aluminum Factory, Marble Works Plant, Woodworks and Joinery factory, Stone Cutting Plant, Workshops & Store Buildings.  

Lumpsum Turnkey Contract for Construction and Maintenance.    

SAUDI Constructioneers  
COMPOUND  
Jubail, K.S.A.

Saudi Constructioneers Est.

Saudi Constructioneers Est.

1399 H.  
1979 G.

SR 15,000,000  
$ 4,348,000

 
A Compound consisting of 30 Villas, Asphalt Roads, Water Treatment Plant and Landscaping.  

Lumpsum Turnkey Contract for Construction and Maintenance.

AIRPORT CUSTOMS COMPLEX, Riyadh, K.S.A.

Mohamed Al-Sabec

Directorate of Customs Ministry of Finance

1398 H.  
1978 G.

SR 45,000,000  
$ 13,043,000

 
Four Large Warehouse, Inspection Facilities, Offices, Mosque, Security Personnel Quarters & Customer Service Arcade.  

Lumpsum Turnkey Contract for Construction and Maintenance.

DUBAH BULK PLANT  
Duba, K.S.A.

C.M.P.

Petromin

1398 H.  
1978 G.

SR 20,000,000  
$ 5,797,000

 
Earthworks, Foundations Offices, Asphalt, Concrete Works, Air-conditioning and Electricity.  

Lumpsum Turnkey Contract for Construction and Maintenance.

NAJRAN BULK PLANT  
Najran, K.S.A.

C.M.P.

Petromin

1398 H.  
1978 G.

SR 13,000,000  
$ 3,768,000

 
Earthworks, Foundations, Offices, Asphalt, Concrete Works, Air-conditioning and Electricity.  

Lumpsum Turnkey Contract for Construction and Maintenance.

ASSULAYIL BULK PLANT Assulayil, K.S.A.

C.M.P.

Petromin

1398 H.  
1978 G

SR 14,000,000  
$ 4,058,000

 
Earthworks, Foundations, Offices, Asphalt, Concrete Works, Air-conditioning and Electricity.  

Lumpsum Turnkey Contract for Construction and Maintenance.

QASSIM BULK PLANT, Qassim, K.S.A.

Jacobs International

Petromin

1397 H.  
1977 G.

SR 2,000,000  
$ 580,000

 
Earthworks, Foundations, Offices, Asphalt, Concrete Works, Air-conditioning and Electricity.  

Lumpsum Turnkey Contract for Construction and Maintenance.

GENERAL ORGANIZATION FOR SOCIAL INSURANCE HEADQUARTER  
Riyadh, K.S.A.

Nabil Fanous & Bassem Shehabi

General Organization for Social Insurance (GOSI)

1396 H.  
1976 G.

SR 31,000,000  
$ 8,986,000

 
A Modern Office Complex more than 8,500 m2 of Office Space, a Cafeteria and a Conference Room.  

Lumpsum Turnkey Contract for Construction and Maintenance.

ADDRIAN   VOLKER COMPOUND  
Jubail, K.S.A.

Saudi Constructioneers Est.

Addrian Volker

1396 H.  
1976 G.

SR 35,000,000  
$ 10,145,000

 
A Compound Consisting of 35 Villas, Swimming Pools, Restaurant, Tennis Court, Roads, Gardens, Courtyards, Electricity and Water Treatment Plant. 

Lumpsum Turnkey Contract for Construction and Maintenance.

DIR*IYAH VOCATIONAL TRAINING CENTER Riyadh, K.S.A.

Saud Abdulla Lingawi

Ministry of Labor

1396 H.  
1976 G.

SR 14,000,000  
$ 4,058,000

 
A Modern School, Laboratories, Classroom, Media Library and a Large Auditorium.  

Lumpsum Turnkey Contract for Construction and Maintenance.

HOUSING COMPOUND FOR THE CONSULTANT OF PORT OF JUBAIL  
Jubail, K.S.A.

Sir William Halcrow & Lingawi Partners

Ports Authority

1396 H.  
1976 G.

SR 63,000,000  
$ 18,261,000  


A Compound Consisting of 63 Villas, Swimming Pools, Tennis Court, Roads, Garden Courtyards, Air-conditioning, Electricity and Water Treatment Plant.  

Lumpsum Turnkey Contract for Construction and Maintenance.     

RIYADH UNIVERSITY STUDENT CENTER Riyadh, K.S.A.

University Engineering Dept.

University of Riyadh

1395 H.  
1975 G.

SR 5,000,000  
$ 1,449,000

 
Dining and Entertainment Facilities, Gymnasium Hall, Billiards and Table Tennis Room, Auditorium and a Mirror Lined Cafeteria seating 200 students.  

Lumpsum Turnkey Contract for Construction and Maintenance.  

PRINCE MOHAMED AL FAISAL VILLA, Riyadh, K.S.A.

Dr. Ahmed Fareed Mustafa

Prince Mohamed Al-Faisal

1394 H.  
1974 G.

SR 7,000,000  
$ 2,029,000

 
A Villa of two Stories with a Swimming Pool and Extension Landscaping.  

Lumpsum Turnkey Contract for Construction and Maintenance.

EXPLOSIVE STORES AT KHURAIS ROAD
Riyadh, K.S.A.

V.B.B.

Saudi Chemical Company

1393 H.  
1973 G.

SR 1,500,000  
$ 435,000

  
Earthworks, Concrete Works, Offices, Asphalted Roads.  

Lumpsum Turnkey Contract for Construction and Maintenance.