KAFD - Cluster j1 - Stage 1 - HSE Make Safe and Dilapidation Surveys

Location:

Riyadh, K.S.A.

Architect/Consultant:

Dar Al Riyadh Consultant / JLL

Owner:

KAFD Development and Managemet Co. (KAFDCo)

Designer:

Various Designers

Awarded:

December, 2018

Contract Value:

SAR 115 million / USD$31 million


General description:

  • Dilapidate the discontinued constructed Parcels 5.03, 5.04, 5.05, 5.06 and 4.05 (5 Parcels = 7 Towers).
  • The parcels included offices, residential, hotels, and mixed use towers.


The project also include:

  • HSE MAKE SAFE:
  • Taking all measures necessary to ensure safe access and building occupancy.
  • Dismantling of unneeded equipment, as well as housekeeping and cleaning of both parcels.
  • DILAPIDATION SURVEY:
  • Prepare status surveys and assessments of all Architectural and MEP installations and systems to the buildings and skywalks. Including, but not limited to:
  • Visual surveys.
  • Simple & Specialist tests and measurements.
  • Internal examination of plant and equipment.
  • Analysis of supporting data.